Wet area rooms of class 2 3 part 4 buildings require floor wastes regardless of the type of shower only to prevent the potential for damage to other sole.
Floor waste gully requirements.
Space and the floor is required to be graded to the floor waste to permit drainage of water.
Floor waste gullies in urinal compartments and other wet areas aim the aim of this technical solution is to clarify the requirements for the provision of floor waste gullies in urinal compartments and other wet areas see figures 1 2 and 3.
A floor waste gully fwg is a floor drain that can receive the discharge from a number of fixtures but connections are limited by the number of discharge pipes and distance see figure 6.
Floor wastes are not required in wet area rooms of class 1 buildings unless the area contains an unenclosed shower in which case the shower waste doubles as the floor waste.
It is common in the building industry to remove central floor waste gullies from bathrooms and other wet areas.
Class 2 3 or class 4 part of a building in apartment buildings residential buildings such as motels and boarding houses and residential parts of commercial buildings it is necessary to install floor wastes in bathrooms and laundries if a bathroom or.
Where the sole function of the floor waste gully is to dispose of water spillage and wash down water a minimum dn 50 riser may be used.
It may also be used as a shower outlet but cannot receive solid waste for example from a wc pan.
It may only receive discharge pipes from wastewater fixtures that are located in the same room.
A floor waste will also form part of a floor waste gully in circumstances where that gully may be required by the pca deemed to satisfy provisions as.
80mm x 50mm squat floor waste gully fwg80 50 pdf 184 kb.
The bca volume 2 is silent on the need to provide floor wastes in a class 1 building such as a single dwelling house.
80mm x 65mm squat floor waste gully.
Plumbing regulations 2008 the.
They may also be used as shower outlets so they are space saving reduce the length of pipework and reduce the number of connections required to the drain.
In the above situations the floor is required by the ncc to be graded to the floor waste to prevent water overflow from penetrating to other occupancies or public spaces in the same building.
Except for rooms containing wall hung urinals in which a floor waste gully is mandatory an.
When installing a bath in a wet area the waste connections must comply with the requirements of the national construction code ncc series whether or not there is a floor waste gully.
A floor waste gully acts as a floor drain as well as receiving the discharge from wastewater fixtures.